mirror of
https://github.com/zephyrproject-rtos/zephyr
synced 2025-09-18 10:11:57 +00:00
If LL Connection Parameter Request or LL Connection Update
or LL PHY Update procedure is started by the local device
while a LL Length Update Request PDU has been sent by peer
then a Rx node has been stored in the llcp_rx place holder
for generation of Length Update procedure complete.
The failing assert check is incorrect in the above scenario
hence remove. Instead a missing append of the allocated Rx
node to the llcp_rx list has been added to the controller
implementation.
This issue relates to commit
|
||
---|---|---|
.. | ||
crypto | ||
hal | ||
hci | ||
include | ||
ll_sw | ||
ticker | ||
util | ||
CMakeLists.txt | ||
Kconfig |